Date:
March 2002
Location: South West Ireland
20 kv Salt Works Program.
Taking in beautiful countryside
but having to contend with very
tough terrain, this contract consisted
of replacing porcelain pin insulators
for much larger glass type and
polymerics to glass discs. Changing
transformers with larger sheds
and the installation of surge
arrestors on overhead
Reference: Gene Young / Liam Musgrave
Date: October 2002
Location:
Start of Network Renewal Project
(Pilot project)
This Contract involved extensive
refurbishment of 10 kV overhead
networks and preparation for 20kV
change over.
Installations of new poles, dual
ratio traformers, larger insulators,
reconductoring 50mm up to 150
aaac.
Refurbishment of some associated
Lv network.
Reference: Gene Young / Liam Musgrave
Date: February 2003
Location: Glenbeigh Mountain,
Ireland
Network Renewal Project
This project was one of the most
challenging ever undertaken by
CPD. Access to this site presented
the biggest challenge of. Due
to the remote location and rough
terrain, we were unable to use
mechanical excavators. Our team
on the ground had to dig 47 pole
holes out by pick and shovel and
install steel tubes, While the
new poles had to be lowered into
position by helicopter.
Reference: Gene Young / Liam Musgrave
Date: May 2003
Location: Co.Kerry, Ireland
Network Renewal Project
Upgrade of Mainline from Killarney
to Killorglin Co.Kerry
Line upgraded to 150mm conductor,
including installation of stouter
poles, wider cross arms and larger
conductor. This Job came under
the NRP project
REF: Tadg Carroll
Date: May 2003
Location: Co. Cork, Ireland
Network Renewal Project, Cork
Upgrading insulators and conductor,
poles and transformers, on 350km
stretch of network near Millstreet,
Co. Cork completing on average
40kms a month.
Reference: Tadg Carroll
Date: May 2004
Location: Dublin, Ireland
Network Refurbishment Project
With Norelec Ireland, Based in
Kilcock nr Dublin averaging 40kms
a month with 15 linesmen. Working
in high profile area, which include
stud farms, in and around the
suburbs of Dublin, required a
high level of customer care, keeping
complaints to a minimum.
Reference: John Blake
Date:
June 2004
Location: Dublin, Ireland
70 Span of wood pole construction
of new build around the town of
Ashbounre, North Co Dublin.
Reference: John Penny
Date: November 2004
Location: North Co.Dublin
Ashbourne Motorway Diversion.
Works involved liasing with the
client, Civil Engineers, and Motorway
contractors.
Diverting 15 span of overhead
network, redirecting it with new
Hv overhead and underground cables,
reconnection to existing transformers
and LV networks.
Reference: John Penny
Date: December 2004
Location: Finglas, North Co. Dublin
Finglas Roundabout Diversion.
30 span of overhead network redirected
to make way new motorway with
an additional 2 x 3 phase transformers
installed.
Reference: John Penny
Date: January 2005 Location:
Dunfierth to longwood relief line.
60 Span new build with 92mm conductor,
serving as a relief feed to the
town of Enfield,
Co Meath.
Reference: Billy Costello
Date: March 2005
Location: Tullamore, Co. Offaly
Network Refurbishment Project
Tullamore.
700kms in total of overhead woodpole
refurbishment, including re-conductor
work, replacing poles and transformers,
and general refurbishment of overhead
network.
Project still on going.
REF: Statia Breen (Norelec Ireland)
Date: May 2005
Location:
110 KV new build Derrybrien.
Completed 8kms of 200mm portal
construction from a new wind farm
over hilly boggy terrain. Again
we were faced with logistical
challenges that were to be only
overcome through hard work and
determination to finish the job
on time and within budget.
Reference: Gerry Ring
January 2006
Lv Refurbishment Program, with
Enterprise Power services for
Clients EDF energy.
North of the M25 in Essex and
Buckinghamshire, Refurbishment
& Recon ABC of 125 spans per
on average month, along with 110
services on average a month, with
total of 19 men on site.
Project still ongoing
Reference: N Youngman
|